Power and load
Rated power, load profile, operating conditions and planned development of the facility.
Power equipment
For energy, industrial facilities and infrastructure. Selection against your technical specification, with design and delivery terms agreed for each project.

Technical specification
Six groups of parameters describe the equipment and help align the request, proposal and conditions at the site.
Rated power, load profile, operating conditions and planned development of the facility.
Rated winding voltages, grid frequency, vector group and voltage regulation requirements.
Construction, cooling method, insulation and installation constraints.
Location, climate, altitude, noise limits and project requirements.
Weight, transport dimensions, access routes, unloading and access to the installation location.
Required technical data sheets, drawings, test reports and acceptance documents.
If some parameters are still undecided, send the information and project requirements you have. We will clarify what is needed to prepare a proposal.
Application context
The purpose of the site determines priorities when selecting and agreeing the design.
For energy facilities, the equipment must align with the project design and grid operating conditions.
The transformer within the power supply system
Industrial loads depend on the production process. Selection considers operating conditions, site constraints and expansion plans.
The transformer within the power supply system
For infrastructure facilities and data centers, selection starts with the power supply design, redundancy requirements and future growth.
The transformer within the power supply system

Working visits
Equipment discussions extend beyond the catalogue to factory floors, testing laboratories and meetings with technical specialists.
The team photographs show a transformer workshop, a high-voltage laboratory and a cable production facility.

Photographs from working visits show the industrial scale of the equipment and production facilities.
From requirements to configuration
Terms are agreed for each project. Technical requirements and delivery planning are discussed together.
We review the technical specification, site purpose, electrical parameters and installation constraints.
We clarify construction, cooling, configuration, interfaces and required documentation.
We confirm the agreed configuration, price, schedule and warranty terms. The scope of supply is discussed explicitly.
We agree acceptance arrangements, required documents, transport constraints and delivery conditions at the site.
Before we talk
Equipment is selected against your specification. Provide the required ratings and design; availability of the specific equipment is confirmed in the proposal.
Start with the facility description, power, voltage, quantity and installation location. We will clarify the remaining requirements with you.
The destination, access route restrictions, unloading arrangements and installation conditions. Weight and transport dimensions are confirmed after design selection and taken into account when planning logistics.
Data sheets, drawings, test reports and acceptance documents are agreed for the project and equipment. The required list should be confirmed before placing an order.
The scope of supply and any additional services are agreed separately. If you require installation supervision, installation or commissioning, include this in your enquiry.
They are confirmed after power, voltage, design, configuration, quantity and delivery conditions have been clarified. Agreed terms are included in the commercial proposal.
Your project
Send your existing specification or include the main parameters in your message. This helps us move straight to equipment selection.
Start with a brief description. We can clarify the details in a conversation.