Skip to content
CSDCTransformers

Power equipment

Transformers
for your
project.

For energy, industrial facilities and infrastructure. Selection against your technical specification, with design and delivery terms agreed for each project.

Power and voltageDesignConfiguration
Transformer on the factory floor with the team during a working visit
Equipment on the factory floor
Photograph from a team working visit

Technical specification

The parameters that
define your configuration.

Six groups of parameters describe the equipment and help align the request, proposal and conditions at the site.

01

Power and load

Rated power, load profile, operating conditions and planned development of the facility.

02

Voltage and connection

Rated winding voltages, grid frequency, vector group and voltage regulation requirements.

03

Design and cooling

Construction, cooling method, insulation and installation constraints.

04

Site conditions

Location, climate, altitude, noise limits and project requirements.

05

Dimensions and delivery

Weight, transport dimensions, access routes, unloading and access to the installation location.

06

Documentation and inspection

Required technical data sheets, drawings, test reports and acceptance documents.

If some parameters are still undecided, send the information and project requirements you have. We will clarify what is needed to prepare a proposal.

Application context

One equipment type.
Different site needs.

The purpose of the site determines priorities when selecting and agreeing the design.

Grid parameters define the requirements.

For energy facilities, the equipment must align with the project design and grid operating conditions.

  • Voltage classes and rated power
  • Regulation, redundancy and load profile
  • Documentation and acceptance requirements
01Grid
02Transformer
03Consumers

The transformer within the power supply system

Team members visiting a high-voltage testing laboratory

Working visits

Behind each supply
is a connection
with production.

Equipment discussions extend beyond the catalogue to factory floors, testing laboratories and meetings with technical specialists.

The team photographs show a transformer workshop, a high-voltage laboratory and a cable production facility.

Working visit to a cable manufacturing facility
Equipment in its working environment

Photographs from working visits show the industrial scale of the equipment and production facilities.

From requirements to configuration

From requirements
to an agreed
supply plan.

Terms are agreed for each project. Technical requirements and delivery planning are discussed together.

01

Review the requirements

We review the technical specification, site purpose, electrical parameters and installation constraints.

02

Agree the design

We clarify construction, cooling, configuration, interfaces and required documentation.

03

Prepare the proposal

We confirm the agreed configuration, price, schedule and warranty terms. The scope of supply is discussed explicitly.

04

Plan documentation and logistics

We agree acceptance arrangements, required documents, transport constraints and delivery conditions at the site.

Before we talk

Questions
to start
with.

Which power ratings and voltage classes are available?

Equipment is selected against your specification. Provide the required ratings and design; availability of the specific equipment is confirmed in the proposal.

Can I enquire without a complete technical specification?

Start with the facility description, power, voltage, quantity and installation location. We will clarify the remaining requirements with you.

What information is needed to deliver a large transformer?

The destination, access route restrictions, unloading arrangements and installation conditions. Weight and transport dimensions are confirmed after design selection and taken into account when planning logistics.

Which documents and tests will be included?

Data sheets, drawings, test reports and acceptance documents are agreed for the project and equipment. The required list should be confirmed before placing an order.

Are installation and commissioning included?

The scope of supply and any additional services are agreed separately. If you require installation supervision, installation or commissioning, include this in your enquiry.

How are price, lead times and warranty determined?

They are confirmed after power, voltage, design, configuration, quantity and delivery conditions have been clarified. Agreed terms are included in the commercial proposal.

Your project

Start with the needs
of your facility.

Send your existing specification or include the main parameters in your message. This helps us move straight to equipment selection.

01Power, voltage and number of units
02Design, operating conditions and installation location
03Documentation, delivery and schedule requirements
Request equipment selection

Start with a brief description. We can clarify the details in a conversation.